City of Kerman
These pictures are of the headworks this city installed when a new wastewater treatment facility was built in 2010. The collection system and lift stations were plagued with rapid grease buildup. However, a bigger problem, as shown in the before photo, was the buildup of 2 to 3 feet of grease in the new headworks that required costly pumping every 5 to 6 weeks. As you can see in the after photo, in only three months of using our Microbe-Lift products, the headworks are clear of grease and flowing freely. The wastewater manager stated that he had never seen any technology that worked to clear the grease before using Microbe-Lift products in the system.
Treatment has now been expanded to the entire collection system. The reduction in backups and overflows, and less need for hydro flushing has saved the city tens of thousands of dollars annually since they started using our products.